- Tubelator AI
- >
- Videos
- >
- People & Blogs
- >
- Master Design Overhaul: Changing Entry Directions and Full-Capacity Deployment
Master Design Overhaul: Changing Entry Directions and Full-Capacity Deployment
Discover how bringing in a master designer led to a complete reevaluation of the existing design, resulting in changes to the entry direction and a full-capacity operational deployment. Explore the process of altering the initial plan and adapting the layout for optimal functionality and efficiency.
Video Summary & Chapters
No chapters for this video generated yet.
Video Transcript
I asked a master to come and have a look.
It completely overturned my design.
Then I put the door in the original position.
Now it's not working.
I have to change the direction.
I'll show you.
The original plan is to come up from here.
It's always been a road from here.
But I came to see the grass.
It's better to open the door over there.
It's from this stone position.
I've already made the fence two circles.
I've built two layers.
And now we're going to open the door from this position
To the yard
Now the direction of the door is west
West and south
It should be this direction
It's good to go up like this
So today
It's possible to rearrange this position
Turn over the excess stones
Make a fence
And then start from here
Later, we will change
Move all the stones in the yard
Add this whole fence
And then the whole yard
and surround the yard
and then the height of the yard
because it is about 30 to 40 cm higher than the room inside
and it will go down
Today, we will continue to build here
and open a road here
By then, the car can go from this position to the yard
One.
Three.
Four.
Five.
I'm so sorry.
I'm so sorry.
I'm so sorry.
I'm so sorry.
Now we are going to go up the road to the yard
The stone I knocked down that day weighs about 400 jin
Now there is about 100 jin left
I knocked down all the extra stones and left 10 tons
That piece is also
I thought there was a big one under it
It turned out to be so thick